It’s safe. It’s free. It’s the law.  

For your safety, you are required by law to call 811 at least two working days before you plan to dig so your underground utility lines can be marked. Follow these steps to get ready to dig:

  • Prior to calling 811, mark the proposed excavation area and make sure it is clearly visible.
  • Call at least three working days before you need to start excavations or digging. Be prepared to give the type of excavation being performed and the specific location of the proposed excavation.
  • The 811 service will connect you with the state one-call center, which will alert participating utility companies about the planned digging so they can mark the appropriate location of their underground lines, if necessary.
  • Local utilities will then come to your home or work site and mark the location of their underground lines using color codes.
  • Check the area before proceeding with your project. If a member utility has not responded or if underground facilities are clearly present and not located, call again to have the area located properly.  

Remember, you are responsible for marking your private lines such as private electric drops, invisible pet fences, sprinkler systems, yard lights and gas grill lines. Now you are officially ready to dig!